Environmental Permit Matrix

Permit Checklist

Select Yes or No to those questions that apply to the project under consideration, then click the submit button at the bottom of this form to view the permits currently required.

View the Question-to-Permit Relationships

Response#Question
YesNo01Traverse Land managed by the United States Bureau of Land Management (BLM)?
YesNo02Traverse Land managed by the United States Bureau of Reclamation (USBR)?
YesNo03Traverse Tribal Lands?
YesNo03aResult in any discharge into "waters of the United States (US)" on tribal lands as defined by Section 404 of the Clean Water Act (CWA)?
YesNo04Involve discharge (placement) of dredged or fill materials into "waters of the US" as defined by Section 404 of the CWA. Ephemeral washes that drain into a "waters of the US" are under the U.S. Army Corps of Engineers (USACE) jurisdiction?
YesNo05Potentially result in direct or indirect impacts to federally listed Threatened and Endangered Species and/or associated habitat?
YesNo06Result in temporary activity or permanent use on Nellis Air Force Base (NAFB) property?
YesNo07Result in any potential effect to historic properties?
YesNo08Disturb wildlife and/or wildlife habitat?
YesNo09Effect (referred to as "salvage and removal") more than 5 native cacti and/or yucca (for the purpose of moving to another location and/or selling)?
YesNo09aWould the proposed project require disturbance of any native plant species and/or native plant species habitat regarded as threatened with extinction (NRS 527.260 - 527.300) on private or federal land.
YesNo10Require or result in any discharge into "waters of the US" as defined by Section 404 of the CWA?
YesNo10aRequire or result in any discharge into "waters of the US" as defined by Section 404 of the CWA?
YesNo11Disturb 5 acres or greater, and discharge storm water runoff from the construction site into a municipal separate storm water sewer system, or “waters of the US?"
YesNo12Cause a temporary point-source discharge to surface water, i.e. natural channel, roadway or storm drain for a duration less than 6 months. (construction dewatering)
YesNo13Require equipment to be used and maintained within surface bodies of water?
YesNo14Require temporary dewatering wells during construction activities, require testing and monitoring wells?
YesNo15Require Nevada Department of Transportation (NDOT) Right-of-way (ROW) encroachment or construction activities within NDOT ROW?
YesNo15aRequire traffic barricade within NDOT ROW?
YesNo16Require storage of 5 gallons or more of flammable liquid inside or 10 gallons or more of flammable liquid outside for 30 days or more?
YesNo16aRequire combustible liquid storage tanks to be moved to different staging areas on the project site during construction activities?
YesNo17Require storage of 10 gallons or more of combustible liquid inside or 25 gallons or more of combustible liquid outside for 30 days or more?
YesNo17aRequire combustible liquid storage tanks to be moved to different staging areas on the project site during construction activities?
YesNo18Require any grading or other land-disturbance activities within Clark County?
YesNo19Require site drainage associated with construction requiring more than 2 acres within Clark County ROW?
YesNo20Require activity within Clark County ROW?
YesNo21Result in a discharge of water in Clark County ROW?
YesNo22Result in impacts to traffic access and/or circulation in Clark County ROW?
YesNo23Require site grading activities in Clark County?
YesNo24Require additional temporary stock piling of earth materials on USBR, County, or private lands not covered under the Clark County Grading Permit?
YesNo25Require construction of on-site and off-site temporary signs (other than those required by dust control permit or signs located in public ROW)?
YesNo26Require construction of perimeter block wall or fence?
YesNo27Require Landscaping?
YesNo28Result in disturbance of previously undisturbed land – related to off-site construction activities within Clark County jurisdiction?
YesNo29Require the use of above-ground generator fuel tanks during construction?
YesNo30Require blasting for construction of facility?
YesNo30aWould the proposed project require use/storage of chemicals or fuel onsite during construction?
YesNo30bWould the project require a mobile fueling unit?
YesNo31Require construction within jurisdiction of the City of Las Vegas?
YesNo31aResult in site drainage associated with construction of a new facility within jurisdiction of the City of Las Vegas?
YesNo31bRequire underground construction on private property or within City of Las Vegas ROW?
YesNo31cRequire off-site construction activity within a City of Las Vegas ROW?
YesNo31dRequire off-site improvements within a City of Las Vegas ROW?
YesNo31eRequire on-site grading activities?
YesNo31fRequire Temporary stock piling of earth materials on private or federal parcels not covered by grading permit?
YesNo31gRequire perimeter block wall or fence?
YesNo31hRequire traffic barricade?
YesNo32Require construction within jurisdiction of the City of Henderson?
YesNo32aResult in public improvements?
YesNo32bRequire topsoil disturbance within a flood zone and/or greater than 2 acres?
YesNo32cRequire blasting within City limits?
YesNo32dRequire use\storage of chemicals or fuel onsite during construction?
YesNo33Require construction within jurisdiction of the City of North Las Vegas?
YesNo33aResult in site drainage associated with grading and construction?
YesNo33bRequire off-site construction, excavation, installation, or occupancy within a City of North Las Vegas ROW?
YesNo33cRequire on-site construction of any structure?
YesNo33dRequire traffic control in public ROW?
YesNo34Require construction, excavation, installation, or occupancy in or near AT&T ROW?
YesNo35Require construction, excavation, installation, or occupancy in or near Cal-Nev ROW?
YesNo36Require construction, excavation, installation, or occupancy in or near Nevada Power ROW?
YesNo37Require construction, excavation, installation, or occupancy in or near Sprint ROW?
YesNo38Require construction, excavation, installation, or occupancy in or near Southwest Gas ROW?
YesNo39Require construction, excavation, installation, or occupancy in or near Kern River Gas ROW?
YesNo40Require activity or occupancy within Southern Nevada Water Authority (SNWA) ROW?
YesNo41Require activity or occupancy within Union Pacific Railroad (UPRR) ROW or easements?
YesNo42Require activity or occupancy on private property?

Note: Individual City Permits may be required in addition to the Clark County, Nevada permits that are similar.