Environmental Permit Matrix

Permit Details

Plans check
Category:City of Las Vegas Permits
Issuing Agency:City of Las Vegas Development Services Center, 333 N. Rancho Drive, Las Vegas, NV 89106
Contact:Office: 702-229-6371
Regulated Activity:Construction within City Jurisdiction.
Prerequisite(s):Must submit five sets of check prints. Must contact Flood Control Section and Traffic Division to see if a drainage study and traffic impact analysis is needed.
Processing Time:3 to 4 weeks for first review
Fees:Percentage of construction costs to be determined at 90 percent design phase.
Submittal:5 sets of check prints
When To Submit:Design phase
Who Submits:Contractor
Who Receives:Contractor
URL(s):http://www.lasvegasnevada.gov/Apply/permits.asp?id=5866#5866