Environmental Permit Matrix

Permit Details

Drainage Study Review/Approval
Category:City of Las Vegas Permits
Issuing Agency:City of Las Vegas Development Services Center, 333 N. Rancho Drive, Las Vegas, NV 89106
Contact:Office: 702-229-6541 Fax: 702-382-8551
Regulated Activity:Site drainage associated with construction of new facility.
Prerequisite(s):Required for site drainage associated with construction of a new facility. Clark County Regional Flood Control District projects are considered capital improvement. The engineer preparing the study must meet with the Flood Control Staff to preview the study prior to the city accepting it for review. Call 702-229-6541 to set up an appointment to submit a new drainage study.
Processing Time:2 weeks or less once the engineer has met with flood control staff
Fees:No fees for projects funded by CCRFCD
Submittal:60 percent design with application, drainage study checklist, and CCRFCD Manual Standard Form 2 Project
When To Submit:Design phase
Who Submits:Engineer
Who Receives:Project proponent
URL(s):http://www.lasvegasnevada.gov/files/permits_licenses/Drainage_Compliance_Report.pdf