| Category: | City of Las Vegas Permits |
| Issuing Agency: | City of Las Vegas Development Services Center, 333 N. Rancho Drive, Las Vegas, NV 89106 |
| Contact: | Office: 702-229-6541 Fax: 702-382-8551 |
| Regulated Activity: | Site drainage associated with construction of new facility. |
| Prerequisite(s): | Required for site drainage associated with construction of a new facility. Clark County Regional Flood Control District projects are considered capital improvement. The engineer preparing the study must meet with the Flood Control Staff to preview the study prior to the city accepting it for review. Call 702-229-6541 to set up an appointment to submit a new drainage study. |
| Processing Time: | 2 weeks or less once the engineer has met with flood control staff |
| Fees: | No fees for projects funded by CCRFCD |
| Submittal: | 60 percent design with application, drainage study checklist, and CCRFCD Manual Standard Form 2 Project |
| When To Submit: | Design phase |
| Who Submits: | Engineer |
| Who Receives: | Project proponent |
| URL(s): | http://www.lasvegasnevada.gov/files/permits_licenses/Drainage_Compliance_Report.pdf |